Bahrawy Consultancy Group

Sunday, 24 June 2018
UTC Timing
LATEST

Projects by Years

Reference List 2009

  • ‎P01‎

  • ‎P02‎

Hawary residential area.

BCG Task
Contractor consultant.
    
Project Description Scope of work  
Interior and exterior design of low voltage and medium voltage networks.


                Client                                                 End User
SAJA Electric for Contracting                        Hawary Group
    
          Starting Date                                            End Date
              Nov - 09                                                   Jan - 11

Telecommunication training course.

BCG Task
Preparation of training program for telecommunication applications in high voltage substations.

Project Description Scope of work  
“Applied telecommunication schemes in high voltage substations, Level 1; Introduction”
Training sessions including:
1 – Introduction
2 – Fiber Optic
3 – PLC
4 – RTU
5 – Substation Automation System.


             Client                                                               End User
Power System Projects “PSP”                         Power System Projects “PSP”
(Subsidary of El Sewedy Group)                    (Subsidary of El Sewedy Group)
    
        Starting Date                                                         End Date
          Dec - 09                                                                  Jan - 11

Reference List 2010

  • ‎P01

  • P02

  • P03

  • P04

  • P05

  • P06

El Sewedy Cement Factory 220/11kV substation.
    
BCG Task
Owner consultant for communication package.
        
Project Description Scope of work  
1 – Preparation of SPECS and BOQs for telecom systems (FO and PLC) and RTU in local substation and
      Two far end substations.
2 – After getting EETC approval, send the SPECS to suppliers.
3 – Evaluation of technical and commercial offers.
4 – Follow up with the supplier during project stage and revision of design documents till   getting EETC
     Approval.
5 – Site supervision for pre- commissioning stage and end to end tests.

             Client                                                                               End User
Power System Projects “PSP”                           Egyptian Electricity Transmission Company “EETC”
(Subsidary of El Sewedy Group)                      

       Starting Date                                                                         End Date
             Jan -10                                                                                Mar - 11

Replacement the old metering system by Automatic Metering Reading System (AMRS) in HV substations in SEC-CTA EOA.
    
BCG Task
Complete design package for replacement of metering panels in East Operating Area (EOA) including 102 high voltage substations of 115kV and 230kV voltage levels.
        
Project Description Scope of work  
1 – Revision of new metering panels internal wiring diagram as per the contractor design.
2 – Interfacing engineering between new metering panels and the existing substation panels.
3 – CT and VT calculations.
4 – As built drawings.
5 – Revision of devices connection with the telecommunication LAN up to dispatch centre as per the
      Contractor design.
6 – Updating the substation layout.
7 – Updating AC and DC supplies requirements.

                                Client                                                                          End User
Al Jazeera Consulting engineers (AJEC) / AUVA (KSA)                  Saudi Electricity Company

                           Starting Date                                                                  End Date
                                Apr -10                                                                       May - 2013

Replacement the old metering system by Automatic Metering Reading System (AMRS) in HV substations in SEC-CTA COA.
    
BCG Task
Complete design package for replacement of metering panels in Central Operating Area (COA) including 190 high voltage substations of 132kV voltage levels.
        
Project Description Scope of work  
1 – Revision of new metering panels internal wiring diagram as per the contractor design.
2 – Interfacing engineering between new metering panels and the existing substation panels.
3 – CT and VT calculations.
4 – As built drawings.
5 – Revision of devices connection with the telecommunication LAN up to dispatch centre as per the
      Contractor design.
6 – Updating the substation layout.
7 – Updating AC and DC supplies requirements.

                              Client                                                                                   End User
Al Jazeera Consulting engineers (AJEC) / AUVA (KSA)                         Saudi Electricity Company

                          Starting Date                                                                           End Date
                               Apr -10                                                                                May - 2013

 

Replacement the old metering system by Automatic Metering Reading System (AMRS) in HV substations in SEC-CTA EHV.
    
BCG Task
Complete design package for replacement of metering panels in Extra High Voltage substations (EHV) including 9 substations of 380kV voltage level in both EOA and COA in KSA.
        
Project Description Scope of work  
1 – Revision of new metering panels internal wiring diagram as per the contractor design.
2 – Interfacing engineering between new metering panels and the existing substation panels.
3 – CT and VT calculations.
4 – As built drawings.
5 – Revision of devices connection with the telecommunication LAN up to dispatch center as per the
     Contractor design.
6 – Updating the substation layout.
7 – Updating AC and DC supplies requirements.

                                  Client                                                                                End User
Al Jazeera Consulting engineers (AJEC) / AUVA (KSA)                         Saudi Electricity Company

                             Starting Date                                                                         End Date
                                 Apr -10                                                                               May - 2013

Gabry residential area.
    
BCG Task
Contractor consultant
    
Project Description Scope of work  
Interior and exterior design of low voltage and medium voltage networks.


               Client                                                    End User
SAJA Electric for Contracting                            Gabry Group

          Starting Date                                             End Date
              Aug -10                                                    Mar – 11

Gabry residential area.
    
BCG Task
Contractor consultant
    
Project Description Scope of work  
Interior and exterior design of low voltage and medium voltage networks.


                Client                                                    End User
SAJA Electric for Contracting                             Gabry Group

           Starting Date                                            End Date
               Aug -10                                                    Mar – 11

Reference List 2011

  • ‎P01‎

  • ‎P02‎

  • ‎P03-1‎

  • ‎P03-2‎

  • ‎P03-3‎

  • ‎P03-4‎

  • ‎P03-5‎

  • ‎P03-6‎

  • P04-1‎

  • P04-2‎

  • P05‎

  • P06‎

Rose Hills Compound.

BCG Task
Owner consultant

Project Description Scope of work  
Revision of electrical design and preparation for bidding documents.


     Client                                            End User
RAWAS Group                             RAWAS Group

 Starting Date                                    End Date
     Jan -11                                               Hold

Gabal El Zayt 220kV GIS S/S.

BCG Task
Owner consultant

Project Description Scope of work  
220kV GIS S/S.

                    Client                                                                 End User
Saleh and Hegab consultant office              Egyptian Electricity Transmission Co. EETC

               Starting Date                                                          End Date
                   Feb -11                                                                  Jun - 11

New Yanbu City, 110/13.8kV GIS S/S.

BCG Task
Contractor Consultant     

Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote ends, including the remote ends itself, Yanbu North, Yanbu East and Yanbu SWCC 110kV substation.

                                  Client                                                                                        End User
Al Jazeera Consulting engineers (AJEC) / ABB Contracting                             Saudi Electricity Company

                             Starting Date                                                                                End Date
                                 Feb -11                                                                                        May - 13

New Tabuk 6A, 132/13.8kV GIS S/S.

BCG Task
Contractor Consultant     

Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote end, including the remote end itself, Tabuk 5B 132kV substation.

                                      Client                                                                                   End User
Al Jazeera Consulting engineers (AJEC) / ABB Contracting                             Saudi Electricity Company

                                 Starting Date                                                                           End Date
                                      Feb -11                                                                                  May - 13

New Al Hanakia, 110/33-13.8kV AIS S/S.

BCG Task
Contractor Consultant     

Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote end, including the remote end itself, Madina East 110kV substation.

                                      Client                                                                                     End User
Al Jazeera Consulting engineers (AJEC) / ABB Contracting                             Saudi Electricity Company

                                  Starting Date                                                                             End Date
                                       Feb -11                                                                                    May - 13

New Al Salama-2, 110/13.8kV GIS S/S.

BCG Task
Contractor Consultant     

Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote ends, including the remote ends itself, EPR, NAP and Faiysaliah 110kV substation.

                                    Client                                                                                      End User
Al Jazeera Consulting engineers (AJEC) / ABB Contracting                             Saudi Electricity Company

                              Starting Date                                                                               End Date
                                  Feb -11                                                                                       May - 13

New Khumra, 110/13.8kV GIS S/S.

BCG Task
Contractor Consultant     

Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote ends, including the remote end itself, HP2 in PP3, 110kV substation.

                                       Client                                                                                   End User
Al Jazeera Consulting engineers (AJEC) / ABB Contracting                             Saudi Electricity Company

                                Starting Date                                                                              End Date
                                    Feb -11                                                                                      May - 13

New Taif-2, 110/13.8kV GIS S/S.

BCG Task
Contractor Consultant     

Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote ends, including the remote end itself, Taif BSP 110kV substation.

                                   Client                                                                                         End User
Al Jazeera Consulting engineers (AJEC) / ABB Contracting                             Saudi Electricity Company

                               Starting Date                                                                                 End Date
                                    Feb -11                                                                                        May - 13

Reinforcement of 7112 110/33-13.8kV Substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of protection system in 7112, 33/13.8kV S/S with the following remote ends:
1 – 7040, 110/33-13.8kV S/S.
2 – 7059, 110/33-13.8kV S/S.

          Client                                            End User
ABB Services (KSA)                      Saudi Electricity Company

    Starting Date                                     End Date
         Oct -11                                             Jan - 13

Reinforcement of 7012 110/33-13.8kV Substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of protection system in 7012, 33/13.8kV S/S with the following remote ends:
1 – 8010, 110/33-13.8kV S/S.
2 – 7018, 110/33-13.8kV S/S.
3 – 7088, 110/33-13.8kV S/S.

          Client                                              End User
ABB Services (KSA)                      Saudi Electricity Company

      Starting Date                                     End Date
           Oct-11                                               Jan -13

Reinforcement of Riyadh Hospital 33kV Substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Electric power feeding of Riyadh Hospital by connecting its local 33kV substation by SEC 33kV distribution network through double feeders with 8119 and 7143 S/S 33kV substations including necessary protection modification in  the Riyadh hospital substation in addition to its two remote ends  8119 and 7143 substations.

          Client                                             End User
ABB Services (KSA)                      Saudi Electricity Company

     Starting Date                                     End Date
          Nov -11                                            Mar -12

Reinforcement of King Saud University 33kV Substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Relay setting calculations.


           Client                                            End User
ABB Services (KSA)                      Saudi Electricity Company

     Starting Date                                    End Date
        Dec -11                                            Jan -12

Reference List 2012

  • P01

  • P02

  • P03

  • P04

  • P05

  • P06

  • P07

  • P08

  • P09

  • P10

  • P11

  • P12

Interconnection of 2 Mobile substations with Generating plant PP4

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage in order to interconnect the two mobile substations with generating plant PP4 in order to reinforce the 132kV network.


                             Client                                                                        End User
Al Jazeera Consulting engineers (AJEC) / Al Ogaimy                 Saudi Electricity Company

                      Starting Date                                                                   End Date
                            Apr -12                                                                         June - 12

New Al Markaz (Central Al Khobar) 115/13.8kV new substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote ends, including the remote end itself, Dahran South 115kV substation.

                         Client                                                                            End User
Al Jazeera Consulting engineers (AJEC) / Al Ogaimy                      National Grid, KSA

                   Starting Date                                                                     End Date
                        Jul -12                                                                            In progress

Reinforcement of 7724 13.8kV substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Conversion of three underground cables to Over Head Transmission lines with their relative necessary protection modifications and SCADA requirements.

       Client                                                 End User
ABB Services (KSA)                      Saudi Electricity Company

   Starting Date                                        End Date
        Jul -12                                                Sept - 13

Reinforcement of Saudi Railways substation.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Relay Setting Calculations.

        Client                                                End User
ABB Services (KSA)                      Saudi Electricity Company

    Starting Date                                       End Date
        Jul -12                                                Aug - 13

Reinforcement of 4, 132/13.8kV substations in Tabuk.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of protection system in the following substations:
1 – Tabuk 2, 132/13.8kV S/S
2 – Tabuk 3, 132/13.8kV S/S
3 – Tabuk 4, 132/13.8kV S/S
4 – Tabuk 6, 132/13.8kV S/S


          Client                                            End User
ABB Contracting (KSA)               Saudi Electricity Company

    Starting Date                                     End Date
         Aug -12                                          May - 13

Reinforcement of Yanbu MED Plant.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of protection system in Yanbu MED plant by replacement the feeding supply.

    Client                                             End User
ABB Services (KSA)                      MARAFIQ, KSA

Starting Date                               End Date
   Aug-12                                         May- 13

115kV BF Protection replacement of Marafiq, Yanbu.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Rehabilitation of existing old Breaker Failure protection scheme by new numerical one.

         Client                                            End User
ABB Services (KSA)                          MARAFIQ, KSA

    Starting Date                                    End Date
         Oct-12                                            May- 13

115kV Line Pilot Diff. protection replacement.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Rehabilitation of existing 115kV line feeder protection inside MAYASS 115kV substation and its three remote ends, 2B, 3C, 5E 115kV substations.

        Client                                            End User
ABB Services (KSA)                          MARAFIQ, KSA

   Starting Date                                      End Date
       Oct-12                                             In Progress

New Haramin High speed 33/13.8kV substation

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including full engineering scope for the new 33kV substation.

       Client                                                     End User
      SIEMENS                                        Saudi Electricity Company

   Starting Date                                             End Date
      Oct-12                                                     In Progress

New Al-Hawea-2, 110/13.8kV GIS S/S.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including secondary engineering for the new substation and its interconnection with its remote ends.

         Client                                            End User
ABB Contracting (KSA)                    National Grid, KSA

    Starting Date                                    End Date
        Nov-12                                         In Progress

Installation of 132kV shunt reactors in four 132/13.8kV GIS S/Ss.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including, reinforcement of existing four, 132kV, substations (8139, 8145, 8147 & 8174) in central area by installing new 40MVAR, 132kV reactor bay(s) including full Engineering scope up to as built stage.

      Client                                            End User
AL ARRAB (KSA)                           National Grid, KSA

 Starting Date                                   End Date
     Dec-12                                         In Progress

Reinforcement of Al Shuhada substation 110/13.8kV S/S.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including, replacement of existing 13.8kV switchgear with new one consisting of three sections with complete interfacing with existing control, protection, annunciation and SCADA systems. In addition to interconnection with existing three, 67MVA, power transformers

       Client                                            End User
ABB Contracting (KSA)                  National Grid, KSA

 Starting Date                                    End Date
     Dec-12                                           In Progress

Reference List 2013

  • P01

  • P02

  • P03

  • P04

  • P05

  • P06

  • P07

  • P08

  • P09

  • P10

  • P11

  • P12

Reinforcement of 5-COA substation

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of five 13kV substations (8070, 8077, 8004, 8096 & 8113) in order to be interconnected with the new substations in 132kV network.

        Client                                            End User
ABB Contracting (KSA)                  National Grid, KSA

   Starting Date                                   End Date
       Dec-12                                          In Progress

New King Abdullah Sport city SASC, 110/13.8kV GIS S/S.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including Electrical engineering for the new substation and its interconnection with its remote ends, including the remote ends, HHR-2 110kV substation and JNE 110kV substation.

                 Client                                                                         End User
HREO (Jordan) / Al Jihaz (KSA)                                   National Grid, KSA / ARAMCO

          Starting Date                                                                   End Date
               Jan-13                                                                        In Progress

New Al Khadra (Abu Saddad) 132/33-13.8kV GIS S/S.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage for the new substations including reinforcement of its two remote ends Addarb and Ashuqaiq 132kV substations.

    Client                                            End User
AECC (KSA)                                  National Grid, KSA

Starting Date                                     End Date
    Jan-13                                            In Progress

Shadeed Iron & Steel Plant in Oman.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of 33kV network by adding new transformers and feeders on 33kV level.

        Client                                            End User
ABB Services (KSA)                      Shadeed Iron & Steel factory Oman

   Starting Date                                    End Date
       Jan-13                                           In Progress

Reinforcement of 132/13.8kV substation # 8135 S/S.

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of 132/13.8kV substation # 8135 by adding new transformer bay and 13.8kV switchgear section in addition to reinforcement of existing 13.8kV sections by adding new outgoing feeder panels.

        Client                                            End User
ABB Services (KSA)                      National Grid, KSA

  Starting Date                                     End Date
      Feb-13                                           In Progress

LPOF Installation Protection, SCADA & TELECOM Equipment WOA

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Reinforcement of 34, 110kV substations by replacement of existing line protection by new numerical type line protection, including SCADA and telecommunication applications. The project includes replacement of GIS current transformers.

       Client                                            End User
ABB Services (KSA)                      National Grid, KSA

Starting Date                                      End Date
       Mar-13                                          In Progress

New Thuwal Town 110/13.8kV GIS S/S

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of its remote end, Thuwal BSP 380/110kV substations.

   Client                                            End User
AECC (KSA)                                  National Grid, KSA

Starting Date                                  End Date
    Mar-13                                         In Progress

New Al Kharj 132/33-13.8kV GIS S/S #8716

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of its two remote ends 8706 and 8020, 132kV substations.

    Client                                            End User
DELTA (KSA)                                  National Grid, KSA

Starting Date                                   End Date
    Apr-13                                          In Progress

New Al Zahraa-2 110/13.8kV GIS S/S

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of its remote end, Makkah north 380/110kV substation.

           Client                                            End User
Radicon Gulf / AECC (KSA)               National Grid, KSA

      Starting Date                                    End Date
           Apr-13                                          In Progress

New Al Shatea 110/13.8kV GIS S/S

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of its remote end Jeddah North West 380/110kV substation.

             Client                                            End User
Radicon Gulf / AECC (KSA)               National Grid, KSA

Starting Date                                           End Date
     Apr-13                                                In Progress

New Al Shariea 110/13.8kV GIS S/S

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of its remote end Wadi Jaleel 380/110kV substation.
.

            Client                                            End User
Radicon Gulf / AECC (KSA)              National Grid, KSA

      Starting Date                                    End Date
           Apr-13                                          In Progress

Reinforcement of existing 132kV, Tabuk #2, Tabuk #5, Al Wajah, Umluj, Sayyada Al Taif and Al Haql substations

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including replacement of existing 33kV and 13.8kV switchgears with complete protection, annunciation and SCADA systems.

  Client                                            End User
SIEMENS                              Saudi Electricity Company

Starting Date                                  End Date
    Apr-13                                         In Progress

  • P13

  • P14

  • P15

  • P16

  • P17

  • P18

  • P19

Reinforcement of existing 380kV Rabigh substation

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including replacement of old 380kV bus bar and breaker failure protection with new numerical system.

          Client                                            End User
ABB Contracting (KSA)                    National Grid, KSA

Starting Date                                         End Date
     Apr-13                                               In Progress

Reinforcement of existing 33/13.8kV substations #7703

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of existing 13.8kV switchgear and protection modification on both 33 and 13.8kV levels.

       Client                                            End User
ABB Contracting (KSA)                 National Grid, KSA

   Starting Date                                    End Date
       Apr-13                                           In Progress

Reinforcement of existing 132/33kV substations #8801, 8802, 8803, 8804, 8805, 8806, 8807, 8808, 8809, 8810, 8811, 8812, 8813, 8816, 8817, 8818, 8821, 8824, 8825, 9006

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including replacement of existing old Auto Reclosing scheme by new numerical one.

        Client                                            End User
ABB Contracting (KSA)                   National Grid, KSA

   Starting Date                                    End Date
       Apr-13                                           In Progress

New Al Aziziyah-3 110/13.8kV substation

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of its remote ends south Aziziyah and Aziziyah-2 110kV substations.

          Client                                           End User
ABB Contracting (KSA)                    National Grid, KSA

     Starting Date                                   End Date
          Apr-13                                        In Progress

Reinforcement of Taif 110kV network by reinforcement of Al Hawiyah and TaiF 110kV substations

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage by adding new 110kV GIS and AIS bays in both substations.

    Client                                   End User
SEGI / BEMCO                      National Grid, KSA

Starting Date                           End Date
     Apr-13                                 In Progress

New TAJAMOUAT 66/11kV substation

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of existing 33 and 13.8kV switchgears and telecommunication systems

                    Client                                                                  End User
Saleh and Hegab consultant office                  Egyptian Electricity Transmission Co. EETC

              Starting Date                                                           End Date
                  Dec-13                                                                 In Progress

Reinforcement of existing 132/33kV substations #8070, 8710, 8802, 8804, 8805, 8807, 8812, 8824 & 8922

BCG Task
Contractor Consultant
    
Project Description Scope of work  
Complete design package up to as built stage including reinforcement of existing 33 and 13.8kV switchgears and telecommunication systems

         Client                                            End User
ABB Contracting (KSA)                     National Grid, KSA

   Starting Date                                     End Date
       Apr-13                                           In Progress

Home About Us Who We Are Reference Projects by Years

Connect with us

FB

tw

li

 

Address

1

16 Joseph Tito St., El Nozha El Gadida, Cairo

info@bahrawy-consult.com
carrier@bahrawy-consult.com